Manitou Exp . Forest		
2009		
Andrew Turnipseed		
CR1000 met data		
Chemistry Tower		
time tag = end of period		
		
Log and Information		
		
Date/Time	Comments	Sensor(s)
August:		
8/19/2009 13:15	Started logging data	PAR 27+2m sensors,2 m SW sensor, LQS 2 and 8 m
8/27/2009 14:40	connected…	Vierling sensors 
8/27/2009 13:11		IRTs (in hindsight - maybe not so good)
8/27/2009 11:11		LQS 4m - no diffuser one.
8/27/2009 14:46		Rain Gauge
September:		
9/4/2009 14:15	New Logger program: V5	
	Replaced LQS 4m	LQS 4m with diffuser (similar to 2 and 8 m ones)
	connected…	HMP35C RH/T at 8 m
9/11/2009 12:20	connected…	HMP35C RH/T at 25.3 m
	started Labview contin. Logging/1 min. avgs.	
9/20/2009 13:25	started saving 5 min avgs. In Labview	
9/29/2009 0:00	noticed that 25.3m RH was haywire.	
9/30/2009 11:15	Disconnected…	Vierling Sensors 
9/30/2009 13:00	connected…	Sunshine sensor (Sdirect and Sdiffuse)
October:		
10/1/2009 0:00	Noticed that Sdirect was haywire 	Sunshine sensor  
	Noticed that IRTs read higher than other T-sensors	
	PAR 2m seemed spiky and not with others	
10/5/2009 13:25	IRT mV converters had low battery.	Reset, but could go out again.
	Sdir is screwed up - Mux channel is OK	
November:		
11/3/2009 10:37	Logger off - replacing multiplexer	
11/3/2009 12:25	Logger on	IRTs read directly now
	connected…	PT101b - atmospheric pressure.
	RH at 25.3 m - looks screwed up	
	Sdir is screwed up - Mux channel is OK	even with new cable.
11/3/2009 14:03	moved rain gauge to other side of tower.	
11/3/2009 14:47	connected…	Met One wind anemometer/vane
	Tleaf and Ttarget may be backwards?	
11/11/2009 13:15	switched IRTs at logger	
December:		
	just let it run…..	